42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

42569-Thumbnail Image.png
Created2003-06-13
Description
This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues

This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP.
42483-Thumbnail Image.png
Created2008-01
Description

This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42331-Thumbnail Image.png
Created1994-10-13
Description

This report is intended to revise the previous watershed hydrologic and hydraulic calculations for the proposed extension of Camino Del Sol Road. This study is necessary because of significant land use changes within the watershed.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.