Matching Items (38)
Filtering by

Clear all filters

42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

42441-Thumbnail Image.png
Created2011-03
Description

Scottsdale Road and Rural Road are identified in the Regional Transportation Plan as an arterial Bus Rapid Transit route. The portion of this route within Scottsdale is programmed and funded in the Transit Life Cycle Program.

Created1996 to 2007
Description

This report was commissioned by the City of Scottsdale and conducted by Behavior Research Center. The purpose of the study was to measure attitudes about the use of photo-based traffic enforcement statewide.

42497-Thumbnail Image.png
ContributorsCasa Grande (Ariz.) (Author)
Created2008-10
Description

This Existing Conditions Report is the first major technical product of the General Plan Update process. It describes the current conditions in the City of Casa Grande and identifies preliminary issues relevant to the update of the 2020 General Plan update. This report details conditions specific to Casa Grande in

This Existing Conditions Report is the first major technical product of the General Plan Update process. It describes the current conditions in the City of Casa Grande and identifies preliminary issues relevant to the update of the 2020 General Plan update. This report details conditions specific to Casa Grande in the areas of locational context, demographics, housing and economic development, land use, historic preservation, transportation, environment and water and wastewater. The information provided in this Existing Conditions Report is intended to provide a basis for community discussions that will inform the City of Casa Grande General Plan Update 2020.

42498-Thumbnail Image.png
ContributorsCasa Grande (Ariz.) (Author)
Created2009-07-06
Description

This update comes at a critical time in the history of Casa Grande. The City has experienced significant change since the 2001 adoption of the Casa Grande General Plan 2010. City limits have expanded and new development has come forward at a rapid pace. These changes raise pertinent questions about

This update comes at a critical time in the history of Casa Grande. The City has experienced significant change since the 2001 adoption of the Casa Grande General Plan 2010. City limits have expanded and new development has come forward at a rapid pace. These changes raise pertinent questions about how the City can and should accommodate the cycle of development over the next 10, 20, and even 30 years.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42982-Thumbnail Image.png
Created2013-06
Description

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the District employed more administrative positions per pupil. The District’s plant operations, food service, and transportation programs operated reasonably efficiently, with cost measures such as cost per square foot, cost per meal, and cost per mile that were similar to or lower than peer districts’ averages. However, the District needs to improve controls over access to critical information systems and strengthen controls over its fuel purchase cards.

42944-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Patagonia ESD’s student AIMS scores in math and reading were lower than peer districts’ averages, and its writing scores were higher. Patagonia UHSD’s scores were higher in all three subject areas than peer districts’, on average. Because the two districts operate essentially as one district, auditors

In fiscal year 2011, Patagonia ESD’s student AIMS scores in math and reading were lower than peer districts’ averages, and its writing scores were higher. Patagonia UHSD’s scores were higher in all three subject areas than peer districts’, on average. Because the two districts operate essentially as one district, auditors considered their operations combined when determining operational efficiency. The districts saved money by operating together but could do more to further reduce costs. The combined District’s cost-efficiency in noninstructional areas was mixed, with some costs higher and some costs lower than peer districts’, on average. However, the District needs to strengthen controls over multiple operational areas, including payroll and accounts payable processing and computer system access and security. The District also needs to improve bus preventative maintenance, ensure bus driver certification requirements are met, and better control fuel inventory.

42827-Thumbnail Image.png
Created2013-12
Description

In fiscal year 2011, Double Adobe Elementary School District’s student AIMS scores for math and reading were lower than the peer districts’ averages and no writing scores were reported. These scores do not include 5th and 6th grade students’ scores, which were invalidated because a teacher violated test security requirements.

In fiscal year 2011, Double Adobe Elementary School District’s student AIMS scores for math and reading were lower than the peer districts’ averages and no writing scores were reported. These scores do not include 5th and 6th grade students’ scores, which were invalidated because a teacher violated test security requirements. The District operated relatively efficiently overall. Double Adobe ESD’s administration, plant operations, and transportation program operated with lower per pupil costs and other costs, such as cost per square foot and cost per mile, than peer district averages. The District did not have any food-service related costs because it has not operated a food service program for at least the past 30 years. Although relatively efficient, the District needs to strengthen its accounting and computer controls as well as controls over its fuel inventory. Further, the District misreported its transportation route mileage and was overfunded by a combined $263,705 for fiscal years 2011 and 2012.