Filtering by
- All Subjects: Floodplain management
- All Subjects: Infrastructure (Economics)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
An update of the City of Yuma's infrastructure improvements plan for its parks and recreation, fire, police, general government, and streets facilities. The update is needed to comply with changes in Arizona Revised Statutes regarding the development (impact) fees that municipalities can assess.
Wilson & Company recently completed the City of Casa Grande Small Area Transportation Study. The SATS notes that “as the City of Casa Grande increases in size and planning area, the roadway network is also growing to meet the additional travel demands significant improvement measures are needed to meet the travel demand generated by forecast population and employment growth”. Given the findings of the SATS, the City of Casa Grande contracted with TischlerBise to calculate an infrastructure improvement plans and updated development fees for transportation.
The City of Casa Grande engaged TischlerBise to update its Infrastructure Improvements Plans and development fees for several categories of necessary public services. TischlerBise previously calculated development fees for the City in 1999, 2003, 2006, and 2008. Municipalities in Arizona may assess development fees to offset infrastructure costs to a municipality associated with providing necessary public services to a development. The development fees must be based on an Infrastructure Improvements Plan. Development fees cannot be used for, among other things: projects not included in the Infrastructure Improvements Plan, projects related to existing development, or costs related to operations and maintenance.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.
The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.
Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.