Filtering by
- All Subjects: Watershed management
- All Subjects: Yuma (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
An analysis of housing in Yuma, Arizona, to profile demographics and employment, review public housing policies, examine fair housing complaints and lending practices for housing, and develop an action plan for Yuma to address impediments to fair housing choice.
An update of the City of Yuma's infrastructure improvements plan for its parks and recreation, fire, police, general government, and streets facilities. The update is needed to comply with changes in Arizona Revised Statutes regarding the development (impact) fees that municipalities can assess.
An update to the City of Yuma 2002 general plan, to assess fire and emergency medical services provided by the city, forecast needs for the next ten years, and detail how the city will serve those future needs.
A master plan for bicycle facilities in the city of Yuma, giving an overview of existing facilities, outlining elements of the new master plan, and providing standards and phased goals for the new facilities.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.