Matching Items (13)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2003 to 2012
Description

The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to

The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to the State Lake Improvement Fund. The information on recreational watercraft usage patterns on Arizona’s lakes and rivers is necessary, in part, to determine the distribution of SLIF funds to applicants.

Created2008-12-15
Description

This update of the Phoenix-Mesa Gateway Airport Master Plan has been undertaken to evaluate the airport's capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of

This update of the Phoenix-Mesa Gateway Airport Master Plan has been undertaken to evaluate the airport's capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of the master plan is to provide systematic guidelines for the airport's overall development, maintenance, and operation.

42244-Thumbnail Image.png
Created2009-12
Description

This plan was undertaken by the Arizona Department of Transportation Multimodal Planning Division Aeronautics Group to evaluate and recommend a terminal area layout to meet anticipated terminal area demands.

41909-Thumbnail Image.png
Created2007-10
Description

Evaluates Pulliam Airport's capabilities and role, forecasts future aviation demand and plans for the timely development of new or expanded facilities to meet demand.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42359-Thumbnail Image.png
Created1986-07
Description

The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.

42358-Thumbnail Image.png
Created1986-11-17
Description

The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.