Matching Items (10)
Filtering by

Clear all filters

42845-Thumbnail Image.png
Created2013-10
Description

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that will increase the safety and future level of service of Meridian Road. This study will also establish a roadway footprint and develop the ultimate right‐of‐way requirement for the corridor. Finally, the study will be utilized as a guide for local agencies and future development along the corridor. The study area for the Meridian Road Corridor Study is approximately 13 miles in length.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42801-Thumbnail Image.png
Created2006-06-23
Description

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or

Given the inevitable transportation changes associated with impending growth in Pinal County, there was a need for a method to assess how corresponding emissions changes might affect PM10 and Ozone concentrations in the county and at the monitor sites. The overall objective of the project was to develop methods or models that could be used in Pinal County to adequately address air pollution issues in the County.

42805-Thumbnail Image.png
Created2013-04
Description

This report and the accompanying Geographic Information System (GIS) datasets summarize the results of the workshop held in Florence, Arizona in 2010. At this workshop, stakeholders representing a broad range of organizations and interests identified and mapped the locations of important wildlife linkages across Pinal County. This report provides background

This report and the accompanying Geographic Information System (GIS) datasets summarize the results of the workshop held in Florence, Arizona in 2010. At this workshop, stakeholders representing a broad range of organizations and interests identified and mapped the locations of important wildlife linkages across Pinal County. This report provides background information on the importance and benefits of conserving wildlife linkages for both people and wildlife in Pinal County and describes the methods used during stakeholder workshops and in developing the accompanying GIS products. It includes a series of maps generated from the digitized stakeholder data that depict the general locations of wildlife linkages and potential barriers to wildlife movement within Pinal County. The maps are followed by tables with descriptive information about the habitat areas each linkage connects, the species each linkage serves, and known threats and potential conservation opportunities associated with each linkage.

41909-Thumbnail Image.png
Created2007-10
Description

Evaluates Pulliam Airport's capabilities and role, forecasts future aviation demand and plans for the timely development of new or expanded facilities to meet demand.

42244-Thumbnail Image.png
Created2009-12
Description

This plan was undertaken by the Arizona Department of Transportation Multimodal Planning Division Aeronautics Group to evaluate and recommend a terminal area layout to meet anticipated terminal area demands.

43188-Thumbnail Image.png
Created2005-06
Description

This report describes the development of base and future socioeconomic estimates for the Pinal Corridor Planning Model, developed by ADOT to support the evaluation of potential new highway corridors in Northern Pinal County. This section presents a summary of the methodology, data sources used, and historical trends in population and

This report describes the development of base and future socioeconomic estimates for the Pinal Corridor Planning Model, developed by ADOT to support the evaluation of potential new highway corridors in Northern Pinal County. This section presents a summary of the methodology, data sources used, and historical trends in population and employment growth. The following two sections present the base and future year methods and resulting estimates of population and employment.

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

Created2003 to 2012
Description

The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to

The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to the State Lake Improvement Fund. The information on recreational watercraft usage patterns on Arizona’s lakes and rivers is necessary, in part, to determine the distribution of SLIF funds to applicants.

Created2008-12-15
Description

This update of the Phoenix-Mesa Gateway Airport Master Plan has been undertaken to evaluate the airport's capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of

This update of the Phoenix-Mesa Gateway Airport Master Plan has been undertaken to evaluate the airport's capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of the master plan is to provide systematic guidelines for the airport's overall development, maintenance, and operation.