Matching Items (75)
Filtering by

Clear all filters

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2009 to 2015
Description

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.

Created2010 to 2013
Description

The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.
ContributorsShand, Robert L. (Author) / U.S. Fish and Wildlife Service (Publisher)
Created1992-07-24
Description

This report presents the results of both a qualitative and quantitative analysis of the drainage problems associated with the South Branch, Upper Carmack watershed. Also included is an economic assessment of the damage potential associated with three distinct storm events.

Created2005 to 2008
Description

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.

Created2007 to 2017
Description

The 20-year transportation plan includes roadway, transit, safety, and environmental and economic vitality elements to help meet the region's transportation goals of improving our safety and cross-town mobility, while reducing traffic congestion.