Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Regional planning
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Creators: JE Fuller/ Hydrology & Geomorphology
The purpose of this study was to develop a multi-modal transportation plan that outlines the region’s transportation priority projects and provides a plan for ultimate implementation. The transportation study was focused around identifying regional mobility needs that can accommodate the anticipated future population and employment growth. This transportation study is a joint effort of Navajo County, the City of Holbrook, the City of Winslow and the Arizona Department of Transportation to develop multi-modal transportation recommendations for the study area, Heber-Overgaard, Holbrook and Winslow over a 20-year planning horizon.
The Yuma Regional Transit Study identifies transit needs within southwestern Yuma County and presents recommended transit system improvements based on three funding scenarios. This study examined current and projected population, demographics, and employment for the region, conducted extensive public outreach and data collection, identified transit deficiencies and developed recommended transit improvements based on the identified deficiencies.
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.
The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.
The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.
The purpose of this project is to provide regional managers and the public with updated comprehensive maps and accompanying datasets for GRD members within the TAMA in the context of its impact patterns on AWS. These datasets are available in raw format from PAG and also will be provided on the Pima County Map Guide Web site for interactive viewing. In the past, CAP also has used this report to address boundary reconciliation issues.