Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Hydrology
- Creators: McNulty, Michael L.
- Creators: Parsons Brinckerhoff
- Creators: Pima County (Ariz.). Small Business Commission
The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.
Water as we talk in terms of growth, habitat protection and it is probably the limiting natural resource in this valley and region. Sustainability was drafted into the groundwater proposal in 1980 and it required all of the Active Management Areas of Arizona to achieve a safe deal within 45 years after balance of plan. The groundwater code had a very unique way to meet the assured water supply requirements. Before you can subdivide property you have to show that there is adequate water supply for 100 years.
This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.