Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Traffic engineering
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Creators: Herman, Patricia M.
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.
The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.
The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.
The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.
The purpose of this project is to provide regional managers and the public with updated comprehensive maps and accompanying datasets for GRD members within the TAMA in the context of its impact patterns on AWS. These datasets are available in raw format from PAG and also will be provided on the Pima County Map Guide Web site for interactive viewing. In the past, CAP also has used this report to address boundary reconciliation issues.
The Floodplain Management Act of 1973 authorized Arizona counties to adopt rules and regulations concerning management of floodplain areas. The Pima County Board of Supervisors, which sits as the Pima County Flood Control District Board of Directors, organized the Pima County Flood Control District on June 5, 1978. The District is responsible for floodplain management activities for unincorporated areas in Pima County (with the exception of national forests, parks, monuments, and Indian Nations) and for the City of South Tucson.