Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Maricopa County (Ariz.)
- All Subjects: Fills (Earthwork)
- All Subjects: Traffic safety
- Creators: Battelle Memorial Institute. Technology Partnership Practice
The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route alternatives. The purpose of this study is to provide technical assistance, not to evaluate or select a preferred route alternative.
This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.
During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.
To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.
This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.
The Annual Report is produced to provide the Board of Supervisors, the Citizen's Audit Advisory Committee, County leadership, and the citizens with information about Internal Audit's performance, accomplishments, and results achieved during the fiscal year.
This report, required by the National Highway Traffic Safety Administration provides an update of highway safety projects throughout the state of Arizona during the Federal Fiscal Year as administered by the Arizona Governor’s Office of Highway Safety.
The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety data (e.g., crashes, fatalities, injuries, citations, etc.). Knowledge of the Arizona political, economic, and demographic environments, as well as highway safety expertise on the part of staff and other partners also are taken into account where appropriate.
This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.