Matching Items (73)
Filtering by

Clear all filters

42897-Thumbnail Image.png
Created2013-10
Description

This report addresses (1) expenditures for the recruitment, retention, training, licensing, and tracking of homes maintained by foster parents; (2) an assessment of whether the Department’s contract process of home recruitment, study, and supervision is the most appropriate means to provide these services; and (3) best performance measures to evaluate

This report addresses (1) expenditures for the recruitment, retention, training, licensing, and tracking of homes maintained by foster parents; (2) an assessment of whether the Department’s contract process of home recruitment, study, and supervision is the most appropriate means to provide these services; and (3) best performance measures to evaluate the effectiveness of these services. Although contracting appears to be an appropriate method for obtaining foster home recruitment-related services, the Department should improve how it contracts for these services.

42569-Thumbnail Image.png
Created2003-06-13
Description
This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues

This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP.
42570-Thumbnail Image.png
Created2003-05
Description

One goal of the SDCP was to obtain a permit from the U.S. Fish and Wildlife Service under Section 10 of the Endangered Species Act to enable incidental take of species protected by the ESA in the course of development in Pima County. This report provides the county with the

One goal of the SDCP was to obtain a permit from the U.S. Fish and Wildlife Service under Section 10 of the Endangered Species Act to enable incidental take of species protected by the ESA in the course of development in Pima County. This report provides the county with the framework to go forward and further its analysis of the final funding costs for a Section 10 Permit.

42314-Thumbnail Image.png
Created2003-10-01
Description

This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.

42316-Thumbnail Image.png
Created2003-12-30
Description

The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42320-Thumbnail Image.png
Created2000-07-24
Description

Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.

42321-Thumbnail Image.png
Created2000-10-06
Description

The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.