Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Children--Services for
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Creators: Pima County (Ariz.). Community Development and Neighborhood Conservation Department. Outside Agency Program
This report addresses (1) expenditures for the recruitment, retention, training, licensing, and tracking of homes maintained by foster parents; (2) an assessment of whether the Department’s contract process of home recruitment, study, and supervision is the most appropriate means to provide these services; and (3) best performance measures to evaluate the effectiveness of these services. Although contracting appears to be an appropriate method for obtaining foster home recruitment-related services, the Department should improve how it contracts for these services.
One goal of the SDCP was to obtain a permit from the U.S. Fish and Wildlife Service under Section 10 of the Endangered Species Act to enable incidental take of species protected by the ESA in the course of development in Pima County. This report provides the county with the framework to go forward and further its analysis of the final funding costs for a Section 10 Permit.
This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.
The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.
Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.
The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.