Matching Items (105)
Filtering by

Clear all filters

42459-Thumbnail Image.png
Created2014-04
Description

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have a teaching certificate. The District’s operational efficiencies were mixed, with some costs higher and some costs lower than peer districts’. However, the District lacked proper oversight and adequate controls over nearly all of its operations. In particular, the District lacked basic administrative processes such as monitoring budgets and maintaining proper controls over expenditures resulting in it overspending its legal budget limits in fiscal years 2009, 2010, and 2011. The District also failed to meet several transportation safety requirements. For example, its primary driver was not certified to drive a school bus. Lastly, the District lacked proper supervision of inmate workers on its school campus.

42460-Thumbnail Image.png
Created2000-08
Description

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route alternatives. The purpose of this study is to provide technical assistance, not to evaluate or select a preferred route alternative.

Created2001 to 2017
Description

The Annual Report is produced to provide the Board of Supervisors, the Citizen's Audit Advisory Committee, County leadership, and the citizens with information about Internal Audit's performance, accomplishments, and results achieved during the fiscal year.

Created2009 to 2015
Description

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of advisory bodies appointed by the Pima County Board of Supervisors.

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2009 to 2015
Description

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.

Created2007 to 2016
Description

The purpose of this report is to measure Pima County’s success in meeting priority needs, goals and strategies as outlined in the City of Tucson and Pima County Consortium Consolidated Plan; in addition to, use of federal HUD entitlement funding including the Community Development Block Grant and Emergency Solutions Grant.

The purpose of this report is to measure Pima County’s success in meeting priority needs, goals and strategies as outlined in the City of Tucson and Pima County Consortium Consolidated Plan; in addition to, use of federal HUD entitlement funding including the Community Development Block Grant and Emergency Solutions Grant. Pima County is also the recipient of HOME funds through a consortium with the City of Tucson. This document also describes the methods used to comply with federal regulations. All of this information chronicles a considerable amount of work by the Community Development and Neighborhood Conservation staff to carry out the mission of preserving and enhancing communities and improving the quality of life for lower income individuals and families in Pima County, Arizona.

Created2011 to 2017
Description

The Annual Action Plans describe City and County allocations for the CDBG, HOME, ESG, and HOPWA programs during the coming year. These allocations fund activities to address goals for each of the primary Consolidated Plan areas: Affordable Housing, Homelessness, Community Development, Special Needs and Citizen Participation. The City of Tucson

The Annual Action Plans describe City and County allocations for the CDBG, HOME, ESG, and HOPWA programs during the coming year. These allocations fund activities to address goals for each of the primary Consolidated Plan areas: Affordable Housing, Homelessness, Community Development, Special Needs and Citizen Participation. The City of Tucson and Pima County have formed a Consortium to plan for these activities. The lead agency is the City of Tucson.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.