Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Air--Pollution
- All Subjects: Recreation areas
- Creators: Battelle Memorial Institute. Technology Partnership Practice
This inventory includes emissions of coarse particulate matter <10 µm in diameter (PM10), fine particulate matter < 2.5 µm (PM2.5), nitrogen oxides, sulfur oxides, and ammonia. Emissions are calculated for both Maricopa County and the PM10 nonattaiment area. Annual totals as well as typical daily emissions are provided for all source categories.
The purpose of the ambient air monitoring network is to sample air pollution in a variety of settings, assess the health and welfare effects, and assist in determining sources of air pollution. In general, six basic monitoring objectives and five measuring scales are used to determine the network design. Since it is physically and fiscally impossible to monitor the air in every location, representative samples must be obtained. These samples are determined by using the monitoring objectives and the spatial measurement scales. The network must be dynamic enough to maintain a current representative sample of the air quality. Air quality issues such as eight-hour ozone non-attainment boundaries and permits for new sources are diverse and controversial subjects for the citizens of Maricopa County. With its robust air monitoring network and mobile monitoring tools, the department strives to provide the most reliable and relevant air monitoring data to the public.
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.
The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.
The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.
The purpose of this project is to provide regional managers and the public with updated comprehensive maps and accompanying datasets for GRD members within the TAMA in the context of its impact patterns on AWS. These datasets are available in raw format from PAG and also will be provided on the Pima County Map Guide Web site for interactive viewing. In the past, CAP also has used this report to address boundary reconciliation issues.