The collaborative process for developing the Tusayan Community Wildfire Protection Plan began May 5, 2004 at a Tusayan/Grand Canyon Chamber of Commerce Board meeting in Tusayan. A CWPP is developed to assist local fire districts, local governmental agencies and residents in the identification of lands—including federal lands—at risk from severe wildfire threat and to identify strategies for reducing fuels on wildlands while improving forest health, supporting local economies, and improving firefighting response capabilities.
The wild land/urban interface is a concern in Coconino County because of the potential for wild land fuels to ignite combustible structures and vice-versa. Destroying homes, property, and trees is just one way that wildfire harms an area. Wildfires can destroy habitat, soils, and forest health, disrupting economic stability, transportation corridors, recreation opportunities, water supplies, and scenery, as well as undermining a community’s emotional and spiritual well-being. Reducing the threat of catastrophic wildfire is a priority in the wild land/urban interface. This plan outlines actions needed to prepare and equip the greater Flagstaff community to live and thrive within our fire-adapted ponderosa pine forests.
A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.
This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.
This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.
The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.
The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.
The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.
Pima County’s Southwest area has been identified by County planners as a potential and strategic growth area. To accommodate population growth, the existing infrastructure must be improved and expanded. The purpose of this Infrastructure Plan is to provide a basis for infrastructure decision-making related to development in the Southwest area. It quantifies the nature, phasing, financial impacts, and funding possibilities for those flood control, parks and recreation, transportation, wastewater infrastructure and other improvements that are necessary to service future saturation growth within the study limits.