Matching Items (68)
Filtering by

Clear all filters

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2009 to 2015
Description

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.
Created2005 to 2008
Description

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.

42279-Thumbnail Image.png
Created2007-05
Description

Pima County’s Southwest area has been identified by County planners as a potential and strategic growth area. To accommodate population growth, the existing infrastructure must be improved and expanded. The purpose of this Infrastructure Plan is to provide a basis for infrastructure decision-making related to development in the Southwest area.

Pima County’s Southwest area has been identified by County planners as a potential and strategic growth area. To accommodate population growth, the existing infrastructure must be improved and expanded. The purpose of this Infrastructure Plan is to provide a basis for infrastructure decision-making related to development in the Southwest area. It quantifies the nature, phasing, financial impacts, and funding possibilities for those flood control, parks and recreation, transportation, wastewater infrastructure and other improvements that are necessary to service future saturation growth within the study limits.

Created2012-05
Description

The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.

42284-Thumbnail Image.png
Created2010-10-15
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Ma

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Map SFHA boundaries based on updated and more detailed information. No new hydraulic structures are present within the study limits.