Filtering by
- All Subjects: Pima County (Ariz.)
- Creators: Elliott D. Pollack & Company
- Creators: Myers, Tom
- Creators: Pima County (Ariz.). Small Business Commission
The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.
The purpose of this study is to (1) develop a fundamental understanding of the problems that exist, and (2) perform a cursory examination of possible management approaches identifying those that appear most plausible for further consideration.
The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.
The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.