Filtering by
- All Subjects: Pima County (Ariz.)
- Creators: Fuller, Jonathan E.
- Creators: Bosselman, Fred P.
- Creators: Parsons Brinckerhoff
- Creators: Pima County (Ariz.). Small Business Commission
The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.
This study identifies the drainage and flooding hazards within the watershed and develops alternatives to address those hazards. It is a comprehensive study that estimates flood and erosion potential, maps watercourses, identifies existing and potential problems and develops preliminary solutions and standards for sound floodplain and stormwater management.
This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.
The Sutherland Valley is a broad, geologically-controlled floodplain. This study attempts to quantify the depth and extent of flooding so that floodplain permits can be issued for development which meets local and federal restrictions.