Matching Items (601)
Filtering by

Clear all filters

42374-Thumbnail Image.png
Created2009-03-27
Description

Anza Park, established in August of 2007, is located within Avra Valley adjacent to and west of the Town of Marana boundary. The park consists of approximately 280 acres located along both sides of the Santa Cruz River. This area is a riparian oasis that supports a rich diversity of

Anza Park, established in August of 2007, is located within Avra Valley adjacent to and west of the Town of Marana boundary. The park consists of approximately 280 acres located along both sides of the Santa Cruz River. This area is a riparian oasis that supports a rich diversity of native plants, birds, and other wildlife, especially as compared to adjacent lands that are biologically depauperate due to decades of intensive agricultural use.

42329-Thumbnail Image.png
Created1994-07-01
Description

This report was prepared to document surface water hydrology and floodplain conditions in accordance with current standards of practice. This information is intended to support issuance of building permits, re-approval of construction drawings to current standards, and issuance of floodplain use permits, if needed.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

42272-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Contributor)
Created2008-10
Description

The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.

79049-Thumbnail Image.png
Contributors陳有 (Contributor)
Created1862-04-23
DescriptionA contract between Claudio, a Chinese settler, and Jose Morales. The contract was to last for six years and lists the legal requirements of both the employee and the employer. Signed by Jose Morales and Claudio, who signed in Chinese.
79039-Thumbnail Image.png
Created1863-04-23
DescriptionA labor contract between Claudio, a Chinese settler, and Jose Morales. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Signed by Jose Morales and Claudio, who signed in Chinese.