Filtering by
- All Subjects: Pima County (Ariz.)
- Creators: Pima County Regional Flood Control District (Ariz.)
- Creators: Kimley-Horn and Associates
- Creators: Elliott D. Pollack & Company
- Creators: Douglas, R. Douglas
The Five-Year Consolidated Plan provides the framework for implementation of both City and County missions and is designed to guide HUD-funded housing, homeless and community development policies and programs over the five-year period beginning July 1, 2010 and ending June 30, 2014. The plan provides a comprehensive overview of federal, state and local programs in those program areas. It describes needs, resources, goals, strategies, and objectives.
The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.
The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.
The principal purpose of Phase One is to identify acquisition priorities for the development of a trail network for pedestrians, equestrains, bicyclists, whole access (handicapped) users, and other non-motorized trail users.
The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Concentration Points for the Unnamed Wash 12, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data.
This Technical Data notebook has been prepared to study a portion of the Pegler Wash located in Pima County, Arizona. The objective of the TDN is provide regulatory discharge rates and floodplain limits along the Pegler Wash using better topographic, hydrologic, and hydraulic data.
These studies was performed to provide drainage, flood, and erosion hazard information for Hacienda del Sol Wash and an unnamed wash running along Hacienda del Sol Road. Topographic, hydrologic, and hydraulic analyses were performed to determine drainage conditions.
The purpose of this study is to provide uniformity in how building permits are processed and development is regulated within sheet flood areas in order to ensure that improvements are adequately protected from flood hazards.
The purpose of this study is to (1) develop a fundamental understanding of the problems that exist, and (2) perform a cursory examination of possible management approaches identifying those that appear most plausible for further consideration.