Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Proske, Hal
- All Subjects: Indochina
- All Subjects: Journalists -Political and social aspects
- All Subjects: Mount Meru
The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.
This report presents the results of both a qualitative and quantitative analysis of the drainage problems associated with the South Branch, Upper Carmack watershed. Also included is an economic assessment of the damage potential associated with three distinct storm events.
The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.
The 20-year transportation plan includes roadway, transit, safety, and environmental and economic vitality elements to help meet the region's transportation goals of improving our safety and cross-town mobility, while reducing traffic congestion.
The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.
The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.
From 2010 to early 2013, under the leadership of the Pima County Health Department, organizations and community members engaged in a comprehensive community health assessment and improvement planning process. The goal of this intensive, community-driven process was to examine the current health needs of Pima County residents and determine how to best address them.