Matching Items (1,370)
Filtering by

Clear all filters

42451-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Contributor)
Created2011-11
Description

The goal of the Tempe Streetcar Urban Design Guidelines is to develop a set of design parameters for the designers who will be involved later during the design process. This is not a document that replaces other City of Tempe or METRO design guidelines, but rather assembles into one place

The goal of the Tempe Streetcar Urban Design Guidelines is to develop a set of design parameters for the designers who will be involved later during the design process. This is not a document that replaces other City of Tempe or METRO design guidelines, but rather assembles into one place some of the overarching aspirations of the community, the City of Tempe and METRO.

42452-Thumbnail Image.png
Created2008
Description

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character with artwork that strives to add substance, style and even a touch of whimsy to the transit experience.

42454-Thumbnail Image.png
ContributorsValley Metro Rail (Contributor)
Created2010-04
Description

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity transit/light rail transit element.

42456-Thumbnail Image.png
Created2007-01
Description

This manual has been developed as a set of general guidelines as well as providing specific criteria to be employed in the preparation and implementation of the planning, design and construction of new light rail corridors and the extension of existing corridors.

42458-Thumbnail Image.png
Created2003
Description

The Central Avenue Corridor Workshop is a key step in the planning process for economic development strategies in the Corridor. Through this Workshop, the City completed the phase of economic development planning, by building consensus amongst real estate brokers, developers, and community representatives.

42459-Thumbnail Image.png
Created2014-04
Description

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have a teaching certificate. The District’s operational efficiencies were mixed, with some costs higher and some costs lower than peer districts’. However, the District lacked proper oversight and adequate controls over nearly all of its operations. In particular, the District lacked basic administrative processes such as monitoring budgets and maintaining proper controls over expenditures resulting in it overspending its legal budget limits in fiscal years 2009, 2010, and 2011. The District also failed to meet several transportation safety requirements. For example, its primary driver was not certified to drive a school bus. Lastly, the District lacked proper supervision of inmate workers on its school campus.

42460-Thumbnail Image.png
Created2000-08
Description

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route alternatives. The purpose of this study is to provide technical assistance, not to evaluate or select a preferred route alternative.

42462-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Contributor)
Created2011-06
Description

This version of the Major Streets and Routes Plan revises the original plan and the 2004 revisions. Looking ahead to pending updates to the classification systems of towns and cities in Maricopa County, the original MSRP stipulated a periodic review and modification of the street functional classification portion of the

This version of the Major Streets and Routes Plan revises the original plan and the 2004 revisions. Looking ahead to pending updates to the classification systems of towns and cities in Maricopa County, the original MSRP stipulated a periodic review and modification of the street functional classification portion of the plan. This revision incorporates the following changes: (1) as anticipated, many of the communities in the County have updated either their general or transportation plans in the time since the adoption of the first MSRP; (2) a new roadway classification, the Arizona Parkway, has been added to the Maricopa County street classification system and the expressway classification has been removed; and (3) a series of regional framework studies have been conducted by the Maricopa Association of Governments to establish comprehensive roadway networks in parts of the West Valley.