Matching Items (73)
Filtering by

Clear all filters

43529-Thumbnail Image.png
Created2004
Description

CAGRD is required by law to submit a plan of operation to the Director of ADWR every ten years. This 2004 Plan of Operation describes the activities that CAGRD proposes to undertake in the Phoenix, Pinal and Tucson Active Management Areas over the next one-hundred years based on continued membershi

CAGRD is required by law to submit a plan of operation to the Director of ADWR every ten years. This 2004 Plan of Operation describes the activities that CAGRD proposes to undertake in the Phoenix, Pinal and Tucson Active Management Areas over the next one-hundred years based on continued membership enrollment through 2015.

43571-Thumbnail Image.png
Created2008-10
Description

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.

43602-Thumbnail Image.png
Created2008-11
Description

The condition of Arizona’s infrastructure has a direct impact on economic productivity and quality of life. As economic competition expands domestically and globally, and as the knowledge economy evolves, the importance of a strong infrastructure increases. Education, in particular, is of growing importance. Arizona’s infrastructure challenges will require commitment and

The condition of Arizona’s infrastructure has a direct impact on economic productivity and quality of life. As economic competition expands domestically and globally, and as the knowledge economy evolves, the importance of a strong infrastructure increases. Education, in particular, is of growing importance. Arizona’s infrastructure challenges will require commitment and creativity to meet the needs and potential of 10 million people and to ensure a positive future for the state.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42320-Thumbnail Image.png
Created2000-07-24
Description

Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42323-Thumbnail Image.png
Created1999-01
Description

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.