Matching Items (20)
Filtering by

Clear all filters

42459-Thumbnail Image.png
Created2014-04
Description

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have a teaching certificate. The District’s operational efficiencies were mixed, with some costs higher and some costs lower than peer districts’. However, the District lacked proper oversight and adequate controls over nearly all of its operations. In particular, the District lacked basic administrative processes such as monitoring budgets and maintaining proper controls over expenditures resulting in it overspending its legal budget limits in fiscal years 2009, 2010, and 2011. The District also failed to meet several transportation safety requirements. For example, its primary driver was not certified to drive a school bus. Lastly, the District lacked proper supervision of inmate workers on its school campus.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42785-Thumbnail Image.png
Created2000-04-14
Description

The depiction of a historical-period property on an early map, whether a house, a ranch, a mining prospect, or an irrigation canal, is often the earliest (and sometimes the only) evidence that cultural features once existed in a particular place. Statistical Research used early maps as a regional preservation-planning tool

The depiction of a historical-period property on an early map, whether a house, a ranch, a mining prospect, or an irrigation canal, is often the earliest (and sometimes the only) evidence that cultural features once existed in a particular place. Statistical Research used early maps as a regional preservation-planning tool by systematically examining a group of early maps of the county for depictions of cultural features. The typology will be used to plot the sites, distinguished by type, on a single map (or possibly on a series of maps) to be digitized by Pima County and incorporated into its GIS database.

42786-Thumbnail Image.png
Created2000-05
Description

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous peoples of the historical period; and (4) Pima County today.

Created1998 to 2003
Description

On March 2, 1999, the Board of Supervisors of Pima County, Arizona adopted the Sonoran Desert Conservation Plan. This Plan is the largest and most comprehensive regional multi-species conservation plan in the United States. These memorandums of understanding record the agreements made with cooperating agencies.

42334-Thumbnail Image.png
Created2014-06
Description

In fiscal year 2011, Chinle Unified School District’s student achievement was similar to peer districts’ averages, and the District’s operational efficiency was mixed, with some costs higher and some costs lower than peer districts’ averages. The District’s per pupil administrative costs were much higher than peer districts’, and it lacked

In fiscal year 2011, Chinle Unified School District’s student achievement was similar to peer districts’ averages, and the District’s operational efficiency was mixed, with some costs higher and some costs lower than peer districts’ averages. The District’s per pupil administrative costs were much higher than peer districts’, and it lacked adequate controls over its vehicles, accounts payable processing, and computer systems. The District’s plant operations costs were also much higher than peer districts’ because the District maintained more building space per student, which was likely not needed since Chinle USD operated its schools far below their designed capacities. The District’s food service program was reasonably efficient, and its transportation program had similar per mile costs as peer districts’. However, the District did not meet bus driver and bus preventative maintenance requirements.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.