Matching Items (105)
Filtering by

Clear all filters

42859-Thumbnail Image.png
Created2010
Description

The District's Coordinated, Comprehensive, Collaborative Flood Hazard Mitigation Partnering (C3FHMP) effort addressed Strategic Initiative No.3 of the Flood Control District of Maricopa County 2009 Comprehensive Plan: Increase Collaboration and Partnerships. The District initiated the process to determine how the funding and resources of other entities could be best applied to

The District's Coordinated, Comprehensive, Collaborative Flood Hazard Mitigation Partnering (C3FHMP) effort addressed Strategic Initiative No.3 of the Flood Control District of Maricopa County 2009 Comprehensive Plan: Increase Collaboration and Partnerships. The District initiated the process to determine how the funding and resources of other entities could be best applied to mitigate flood hazards in Maricopa County, or where mutual benefits would be realized.

43529-Thumbnail Image.png
Created2004
Description

CAGRD is required by law to submit a plan of operation to the Director of ADWR every ten years. This 2004 Plan of Operation describes the activities that CAGRD proposes to undertake in the Phoenix, Pinal and Tucson Active Management Areas over the next one-hundred years based on continued membershi

CAGRD is required by law to submit a plan of operation to the Director of ADWR every ten years. This 2004 Plan of Operation describes the activities that CAGRD proposes to undertake in the Phoenix, Pinal and Tucson Active Management Areas over the next one-hundred years based on continued membership enrollment through 2015.

43571-Thumbnail Image.png
Created2008-10
Description

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.

43602-Thumbnail Image.png
Created2008-11
Description

The condition of Arizona’s infrastructure has a direct impact on economic productivity and quality of life. As economic competition expands domestically and globally, and as the knowledge economy evolves, the importance of a strong infrastructure increases. Education, in particular, is of growing importance. Arizona’s infrastructure challenges will require commitment and

The condition of Arizona’s infrastructure has a direct impact on economic productivity and quality of life. As economic competition expands domestically and globally, and as the knowledge economy evolves, the importance of a strong infrastructure increases. Education, in particular, is of growing importance. Arizona’s infrastructure challenges will require commitment and creativity to meet the needs and potential of 10 million people and to ensure a positive future for the state.

42852-Thumbnail Image.png
Created2009
Description

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews the District's efforts to solve flooding problems, and formulates five-year plans to reduce flooding through flood control project construction, floodplain identification, and planning programs throughout the county.

42853-Thumbnail Image.png
Created2005-11-02
Description

A report shall be prepared at least every five years beginning in 1985 and shall indicate the past efforts of the district in eliminating or minimizing flood control problems and state the planned future work of the district to eliminate or minimize flood control problems.

42314-Thumbnail Image.png
Created2003-10-01
Description

This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.

42315-Thumbnail Image.png
Created2007-08-08
Description

The purpose of this study is to provide uniformity in how building permits are processed and development is regulated within sheet flood areas in order to ensure that improvements are adequately protected from flood hazards.

42316-Thumbnail Image.png
Created2003-12-30
Description

The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.