Filtering by
- All Subjects: Floodplain management
- All Subjects: Finance, Public
- Creators: Battelle Memorial Institute. Technology Partnership Practice
The Board of Supervisors make an estimate of the different amounts required to meet the public expenditures/expenses for the ensuing year, also an estimate of revenues from sources other than direct taxation, and the amount to be raised by taxation upon real and personal property of Graham County.
The Annual Report is produced to provide the Board of Supervisors, the Citizen's Audit Advisory Committee, County leadership, and the citizens with information about Internal Audit's performance, accomplishments, and results achieved during the fiscal year.
This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.
Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.
The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.
This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.
This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.
Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.
This report was prepared to document surface water hydrology and floodplain conditions in accordance with current standards of practice. This information is intended to support issuance of building permits, re-approval of construction drawings to current standards, and issuance of floodplain use permits, if needed.