Filtering by
- All Subjects: City planning
- All Subjects: Land use
- All Subjects: Roads--Finance
- Creators: Battelle Memorial Institute. Technology Partnership Practice
The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while steering community development and project funding. The study findings will also be incorporated into the Town's Capital Improvement Planning process for the next 5-, 10-, and 20-year time frames.
The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.
The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City intends to see redeveloped, with mixed residential and commercial uses to create a dynamic new “front door” for Chandler. The purpose of these design guidelines is to guide zoning requests within the South Arizona Avenue Corridor to achieve the objectives of the Chandler General Plan. The overall goal of these objectives is to implement the vision for South Arizona Avenue. The guidelines address the major design aspects of new office, retail and residential buildings in the corridor. Design Guidelines are not building or streetscape designs; they provide design direction so that each project’s architectural design will reinforce the City’s strategic intentions as this important area of the city responds to its new role as Chandler’s “front door.” These guidelines also identify streetscape design principles for South Arizona Avenue with the objective of coordinating public and private design in the Corridor.
The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.
Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.
This report is intended to revise the previous watershed hydrologic and hydraulic calculations for the proposed extension of Camino Del Sol Road. This study is necessary because of significant land use changes within the watershed.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.