Matching Items (80)
Filtering by

Clear all filters

Created2013-10
Description

The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while

The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while steering community development and project funding. The study findings will also be incorporated into the Town's Capital Improvement Planning process for the next 5-, 10-, and 20-year time frames.

42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42910-Thumbnail Image.png
Created2010-01-14
Description

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City intends to see redeveloped, with mixed residential and commercial uses to create a dynamic new “front door” for Chandler. The purpose of these design guidelines is to guide zoning requests within the South Arizona Avenue Corridor to achieve the objectives of the Chandler General Plan. The overall goal of these objectives is to implement the vision for South Arizona Avenue. The guidelines address the major design aspects of new office, retail and residential buildings in the corridor. Design Guidelines are not building or streetscape designs; they provide design direction so that each project’s architectural design will reinforce the City’s strategic intentions as this important area of the city responds to its new role as Chandler’s “front door.” These guidelines also identify streetscape design principles for South Arizona Avenue with the objective of coordinating public and private design in the Corridor.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

41889-Thumbnail Image.png
Created2009
Description

A master plan for bicycle facilities in the city of Yuma, giving an overview of existing facilities, outlining elements of the new master plan, and providing standards and phased goals for the new facilities.

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2009 to 2015
Description

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.
Created2005 to 2008
Description

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.