Matching Items (65)
Filtering by

Clear all filters

42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42910-Thumbnail Image.png
Created2010-01-14
Description

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City intends to see redeveloped, with mixed residential and commercial uses to create a dynamic new “front door” for Chandler. The purpose of these design guidelines is to guide zoning requests within the South Arizona Avenue Corridor to achieve the objectives of the Chandler General Plan. The overall goal of these objectives is to implement the vision for South Arizona Avenue. The guidelines address the major design aspects of new office, retail and residential buildings in the corridor. Design Guidelines are not building or streetscape designs; they provide design direction so that each project’s architectural design will reinforce the City’s strategic intentions as this important area of the city responds to its new role as Chandler’s “front door.” These guidelines also identify streetscape design principles for South Arizona Avenue with the objective of coordinating public and private design in the Corridor.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

41889-Thumbnail Image.png
Created2009
Description

A master plan for bicycle facilities in the city of Yuma, giving an overview of existing facilities, outlining elements of the new master plan, and providing standards and phased goals for the new facilities.

42279-Thumbnail Image.png
Created2007-05
Description

Pima County’s Southwest area has been identified by County planners as a potential and strategic growth area. To accommodate population growth, the existing infrastructure must be improved and expanded. The purpose of this Infrastructure Plan is to provide a basis for infrastructure decision-making related to development in the Southwest area.

Pima County’s Southwest area has been identified by County planners as a potential and strategic growth area. To accommodate population growth, the existing infrastructure must be improved and expanded. The purpose of this Infrastructure Plan is to provide a basis for infrastructure decision-making related to development in the Southwest area. It quantifies the nature, phasing, financial impacts, and funding possibilities for those flood control, parks and recreation, transportation, wastewater infrastructure and other improvements that are necessary to service future saturation growth within the study limits.

42284-Thumbnail Image.png
Created2010-10-15
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Ma

This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Map SFHA boundaries based on updated and more detailed information. No new hydraulic structures are present within the study limits.

Created2007-10-12
Description

Purpose of this report is to provide a detailed analysis of the runoff characteristics of the Diamond Bell Ranch area.To this end, HEC-HMS models were generated to analyze the runoff under existing watershed conditions.

42314-Thumbnail Image.png
Created2003-10-01
Description

This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.

42316-Thumbnail Image.png
Created2003-12-30
Description

The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.