Matching Items (4)
Filtering by

Clear all filters

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

42742-Thumbnail Image.png
Created2000-09
Description

A companion to the Preliminary Ranch Conservation Element, this report brings together leaders in the area of ranch conservation and compiles their expert writings on ecological and economic sustainability in ranching.

42438-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2009-09
Description

Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change

Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.

42371-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2012-04
Description

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.