Matching Items (85)
Filtering by

Clear all filters

Created2012-05
Description

In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a public education project about sustainable communities and transit-oriented development along the Metro Light Rail in Phoenix, Tempe, and Mesa, Arizona. The resulting reports present neighborhood analyses and transit-oriented development issues for eight light rail stations selected

In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a public education project about sustainable communities and transit-oriented development along the Metro Light Rail in Phoenix, Tempe, and Mesa, Arizona. The resulting reports present neighborhood analyses and transit-oriented development issues for eight light rail stations selected by the Arizona Department of Housing and the Sustainable Communities Working Group, providing base information on the square half mile area surrounding these sites.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2008-06-27
Description

At a “micro” level, the study developed information and provided recommendations to assist each of the paratransit programs in the region to operate services in the most efficient and effective manner possible. At the “macro” level, the study considered alternative regional service designs and developed a regional service plan for

At a “micro” level, the study developed information and provided recommendations to assist each of the paratransit programs in the region to operate services in the most efficient and effective manner possible. At the “macro” level, the study considered alternative regional service designs and developed a regional service plan for the area that would improve mobility for people with disabilities and satisfy the requirements of the Americans with Disabilities Act.

Created2007 to 2016
Description

The annual Transit Performance Report provides information to the Board of Directors and member cities concerning ridership, operating costs, fare revenue, and serves as input to Maricopa Association of Governments' Regional Transportation Plan updates.

Created2006 to 2017
Description

With the agency integration of Valley Metro and Valley Metro Rail, the budgets for each agency are developed with a unified staffing plan but are maintained as two separate financial entities, with fund and project accounting to segregate revenues and expenses. Each Operating and Capital Budget has been prepared with

With the agency integration of Valley Metro and Valley Metro Rail, the budgets for each agency are developed with a unified staffing plan but are maintained as two separate financial entities, with fund and project accounting to segregate revenues and expenses. Each Operating and Capital Budget has been prepared with the goal of delivering a fiscally prudent, balanced budget. FY 2006/2007 was the first full year of Proposition 400 Public Transportation Fund revenues; FY 2005/2006 reflected only five months of PTF revenues.

Created2007-03-15
Description

Study to determine overall performance of current bus service offerings through a detailed analysis of performance factors. Outcomes should include strategies to improve, eliminate or modify lowest performance-related services and development of recurring evaluation strategy and methodology that can be applied to a regular rating process.

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.