Matching Items (5)
Filtering by

Clear all filters

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-09-03
Description

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the Picture Rocks study area and recommend a program of short-range (0-5 years), mid-range (6-10 years), and long-range (11-20 years) improvements.

42556-Thumbnail Image.png
Created2007-08-08
Description

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.

42311-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2008-04-08
Description

Flooding and erosion within the Ranch Estates subdivision during the 2007 summer monsoon season raised the concerns of homeowners. This study addresses the impact of recent improvements in the drainage area upstream; provides updated flood-hazard mapping for the area, and identifies mitigation measures that could be implemented by the affected

Flooding and erosion within the Ranch Estates subdivision during the 2007 summer monsoon season raised the concerns of homeowners. This study addresses the impact of recent improvements in the drainage area upstream; provides updated flood-hazard mapping for the area, and identifies mitigation measures that could be implemented by the affected homeowners to address their flood/erosion hazards.

42289-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2008-10-07
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision application for a portion of the Friendly Village Wash. It includes detailed hydrologic and hydraulic analyses performed to determine proposed regulatory discharge rates at key locations along the Wash, and to determine floodplain limits.