Matching Items (80)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

Created2008-12-15
Description

This update of the Phoenix-Mesa Gateway Airport Master Plan has been undertaken to evaluate the airport's capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of

This update of the Phoenix-Mesa Gateway Airport Master Plan has been undertaken to evaluate the airport's capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of the master plan is to provide systematic guidelines for the airport's overall development, maintenance, and operation.

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2009 to 2015
Description

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.