Matching Items (6)
Filtering by

Clear all filters

42556-Thumbnail Image.png
Created2007-08-08
Description

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.

42340-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Publisher)
Created1993-07-30
Description

The purpose of this study is to (1) develop a fundamental understanding of the problems that exist, and (2) perform a cursory examination of possible management approaches identifying those that appear most plausible for further consideration.

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

ContributorsShand, Robert L. (Author) / U.S. Fish and Wildlife Service (Publisher)
Created1992-07-24
Description

This report presents the results of both a qualitative and quantitative analysis of the drainage problems associated with the South Branch, Upper Carmack watershed. Also included is an economic assessment of the damage potential associated with three distinct storm events.

42272-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Contributor)
Created2008-10
Description

The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.

42355-Thumbnail Image.png
ContributorsFuller, Jonathan E. (Author) / U.S. Fish and Wildlife Service (Publisher)
Created1988-08-09
Description

The Sutherland Valley is a broad, geologically-controlled floodplain. This study attempts to quantify the depth and extent of flooding so that floodplain permits can be issued for development which meets local and federal restrictions.