Matching Items (36)
Filtering by

Clear all filters

Created2010-06-10
Description

The purpose of this study is to provide flood and erosion hazard information for Soldier Canyon Wash for use by the District in floodplain use permitting and and floodplain management.

Created2009 to 2013
Description

This study identifies the drainage and flooding hazards within the watershed and develops alternatives to address those hazards. It is a comprehensive study that estimates flood and erosion potential, maps watercourses, identifies existing and potential problems and develops preliminary solutions and standards for sound floodplain and stormwater management.

Created2008-03-04
Description

These studies was performed to provide drainage, flood, and erosion hazard information for Hacienda del Sol Wash and an unnamed wash running along Hacienda del Sol Road. Topographic, hydrologic, and hydraulic analyses were performed to determine drainage conditions.

Created2009 to 2015
Description

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of advisory bodies appointed by the Pima County Board of Supervisors.

Created2007 to 2016
Description

The purpose of this report is to measure Pima County’s success in meeting priority needs, goals and strategies as outlined in the City of Tucson and Pima County Consortium Consolidated Plan; in addition to, use of federal HUD entitlement funding including the Community Development Block Grant and Emergency Solutions Grant.

The purpose of this report is to measure Pima County’s success in meeting priority needs, goals and strategies as outlined in the City of Tucson and Pima County Consortium Consolidated Plan; in addition to, use of federal HUD entitlement funding including the Community Development Block Grant and Emergency Solutions Grant. Pima County is also the recipient of HOME funds through a consortium with the City of Tucson. This document also describes the methods used to comply with federal regulations. All of this information chronicles a considerable amount of work by the Community Development and Neighborhood Conservation staff to carry out the mission of preserving and enhancing communities and improving the quality of life for lower income individuals and families in Pima County, Arizona.

Created2011 to 2017
Description

The Annual Action Plans describe City and County allocations for the CDBG, HOME, ESG, and HOPWA programs during the coming year. These allocations fund activities to address goals for each of the primary Consolidated Plan areas: Affordable Housing, Homelessness, Community Development, Special Needs and Citizen Participation. The City of Tucson

The Annual Action Plans describe City and County allocations for the CDBG, HOME, ESG, and HOPWA programs during the coming year. These allocations fund activities to address goals for each of the primary Consolidated Plan areas: Affordable Housing, Homelessness, Community Development, Special Needs and Citizen Participation. The City of Tucson and Pima County have formed a Consortium to plan for these activities. The lead agency is the City of Tucson.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

42735-Thumbnail Image.png
Created2000-05
DescriptionDocuments the preparation of a geographic information system cover that represents springs in Pima County, discusses characteristics of certain springs in Pima County, and identifies actions needed to improve the conservation of springs and spring habitats.
42691-Thumbnail Image.jpg
Created1999
Description

Water as we talk in terms of growth, habitat protection and it is probably the limiting natural resource in this valley and region. Sustainability was drafted into the groundwater proposal in 1980 and it required all of the Active Management Areas of Arizona to achieve a safe deal within 45

Water as we talk in terms of growth, habitat protection and it is probably the limiting natural resource in this valley and region. Sustainability was drafted into the groundwater proposal in 1980 and it required all of the Active Management Areas of Arizona to achieve a safe deal within 45 years after balance of plan. The groundwater code had a very unique way to meet the assured water supply requirements. Before you can subdivide property you have to show that there is adequate water supply for 100 years.

42371-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2012-04
Description

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.