Matching Items (8)
Filtering by

Clear all filters

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

Created2009 to 2013
Description

This study identifies the drainage and flooding hazards within the watershed and develops alternatives to address those hazards. It is a comprehensive study that estimates flood and erosion potential, maps watercourses, identifies existing and potential problems and develops preliminary solutions and standards for sound floodplain and stormwater management.

ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-09-03
Description

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the Picture Rocks study area and recommend a program of short-range (0-5 years), mid-range (6-10 years), and long-range (11-20 years) improvements.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42355-Thumbnail Image.png
ContributorsFuller, Jonathan E. (Author) / U.S. Fish and Wildlife Service (Publisher)
Created1988-08-09
Description

The Sutherland Valley is a broad, geologically-controlled floodplain. This study attempts to quantify the depth and extent of flooding so that floodplain permits can be issued for development which meets local and federal restrictions.

68430-Thumbnail Image.png
Created2012-01
Description

Afterschool youth-development programs (AYDs) have grown significantly during the past 15 years in Arizona and nationally. Many providers have moved beyond simply providing a safe haven to actively promoting young people’s development. However, there is still tremendous opportunity for growth. There is also a continuing need to enhance coordination and

Afterschool youth-development programs (AYDs) have grown significantly during the past 15 years in Arizona and nationally. Many providers have moved beyond simply providing a safe haven to actively promoting young people’s development. However, there is still tremendous opportunity for growth. There is also a continuing need to enhance coordination and collaboration among programs in order to extend their resources and heighten their impact.

Morrison Institute worked with AzCASE and VSUW to construct a 55-question survey using Qualtrics on-line software. While the term “afterschool” was used, the survey was designed to measure all types of out-of-school programs, regardless of whether they operate before or after school, on weekends, or during school and summer breaks. Approximately 1,800 questionnaires were distributed to individual program sites in Maricopa and Pima counties via a list provided by AzCASE. Though the survey did not utilize a random sample, its 38 percent response rate (681 returns) suggests that its findings can help educators, youth-development professionals, policymakers and the business community understand the scope, characteristics and needs of afterschool services in Arizona’s two largest population centers.

42311-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2008-04-08
Description

Flooding and erosion within the Ranch Estates subdivision during the 2007 summer monsoon season raised the concerns of homeowners. This study addresses the impact of recent improvements in the drainage area upstream; provides updated flood-hazard mapping for the area, and identifies mitigation measures that could be implemented by the affected

Flooding and erosion within the Ranch Estates subdivision during the 2007 summer monsoon season raised the concerns of homeowners. This study addresses the impact of recent improvements in the drainage area upstream; provides updated flood-hazard mapping for the area, and identifies mitigation measures that could be implemented by the affected homeowners to address their flood/erosion hazards.

42289-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2008-10-07
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision application for a portion of the Friendly Village Wash. It includes detailed hydrologic and hydraulic analyses performed to determine proposed regulatory discharge rates at key locations along the Wash, and to determine floodplain limits.