Filtering by
- All Subjects: Pima County (Ariz.)
- Creators: Elliott D. Pollack & Company
- Creators: Anyon, Roger
- Creators: Myers, Tom
- Creators: Pima County (Ariz.). County Attorney's Office
- Creators: Tucson (Ariz.)
The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.
In order to communicate effectively about land use in Pima County, we must understand that different individuals and groups of people have assigned meaning to places and landscapes in Pima County in accordance with their experiences and their mode of communication. Ten different cultures and their landscapes are described, providing a fascinating summary of the history of each group in the area.
A plan to create a foundation upon which solar deployment in southern Arizona can be accelerated.
The purpose of this study is to (1) develop a fundamental understanding of the problems that exist, and (2) perform a cursory examination of possible management approaches identifying those that appear most plausible for further consideration.
The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.
The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.