Matching Items (12)
Filtering by

Clear all filters

Created1945-02-19
Description

C.C. Tillotson to Carl T. Hayden, 2/19/1945 re: Colorado-Verde Project, water allocations and Mexican water.

Created1945-04-27
Description

C.C. Tillotson to Carl T. Hayden, 4/27/1944 re: Colorado-Verde Project, water allocations and Mexican water.

Created1945-01-29
Description

"Arizona's Benefits From the Colorado River," by the Colorado Verde River Association, January 29, 1945.

43224-Thumbnail Image.png
Created2006-01-06
Description

This report of the Indian Firming Study Commission will provide as background an overview and description of the State’s obligation for Indian Firming and an overview of the modeling efforts completed by Arizona Department of Water Resources staff to determine the estimated volumetric obligation for Indian Firming. Additionally, this report

This report of the Indian Firming Study Commission will provide as background an overview and description of the State’s obligation for Indian Firming and an overview of the modeling efforts completed by Arizona Department of Water Resources staff to determine the estimated volumetric obligation for Indian Firming. Additionally, this report will summarize the solution elements reviewed by the Study Commission, including the water supply availability analysis and a review of the estimated cost and availability of funds to meet the obligation. Finally, the report will provide the recommendations from the Study Commission to the Arizona Legislature.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.