Matching Items (12)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created1945-02-19
Description

C.C. Tillotson to Carl T. Hayden, 2/19/1945 re: Colorado-Verde Project, water allocations and Mexican water.

Created1945-04-27
Description

C.C. Tillotson to Carl T. Hayden, 4/27/1944 re: Colorado-Verde Project, water allocations and Mexican water.

Created1945-01-29
Description

"Arizona's Benefits From the Colorado River," by the Colorado Verde River Association, January 29, 1945.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

43224-Thumbnail Image.png
Created2006-01-06
Description

This report of the Indian Firming Study Commission will provide as background an overview and description of the State’s obligation for Indian Firming and an overview of the modeling efforts completed by Arizona Department of Water Resources staff to determine the estimated volumetric obligation for Indian Firming. Additionally, this report

This report of the Indian Firming Study Commission will provide as background an overview and description of the State’s obligation for Indian Firming and an overview of the modeling efforts completed by Arizona Department of Water Resources staff to determine the estimated volumetric obligation for Indian Firming. Additionally, this report will summarize the solution elements reviewed by the Study Commission, including the water supply availability analysis and a review of the estimated cost and availability of funds to meet the obligation. Finally, the report will provide the recommendations from the Study Commission to the Arizona Legislature.

42359-Thumbnail Image.png
Created1986-07
Description

The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.

42358-Thumbnail Image.png
Created1986-11-17
Description

The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.