Matching Items (8)
Filtering by

Clear all filters

Created2009 to 2016
Description

This report, required by the National Highway Traffic Safety Administration provides an update of highway safety projects throughout the state of Arizona during the Federal Fiscal Year as administered by the Arizona Governor’s Office of Highway Safety.

Created2010 to 2017
Description

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety data (e.g., crashes, fatalities, injuries, citations, etc.). Knowledge of the Arizona political, economic, and demographic environments, as well as highway safety expertise on the part of staff and other partners also are taken into account where appropriate.

Created1945-02-19
Description

C.C. Tillotson to Carl T. Hayden, 2/19/1945 re: Colorado-Verde Project, water allocations and Mexican water.

Created1945-04-27
Description

C.C. Tillotson to Carl T. Hayden, 4/27/1944 re: Colorado-Verde Project, water allocations and Mexican water.

Created1945-01-29
Description

"Arizona's Benefits From the Colorado River," by the Colorado Verde River Association, January 29, 1945.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

42126-Thumbnail Image.png
Created2010-05
Description

The Pinetop-Lakeside Pedestrian Safety and Transportation Study is a PARA that is a joint effort of ADOT and the Town of Pinetop-Lakeside. The pedestrian study reviewed past and current information and considered future travel demand.

43224-Thumbnail Image.png
Created2006-01-06
Description

This report of the Indian Firming Study Commission will provide as background an overview and description of the State’s obligation for Indian Firming and an overview of the modeling efforts completed by Arizona Department of Water Resources staff to determine the estimated volumetric obligation for Indian Firming. Additionally, this report

This report of the Indian Firming Study Commission will provide as background an overview and description of the State’s obligation for Indian Firming and an overview of the modeling efforts completed by Arizona Department of Water Resources staff to determine the estimated volumetric obligation for Indian Firming. Additionally, this report will summarize the solution elements reviewed by the Study Commission, including the water supply availability analysis and a review of the estimated cost and availability of funds to meet the obligation. Finally, the report will provide the recommendations from the Study Commission to the Arizona Legislature.