Matching Items (8)
Filtering by

Clear all filters

Created2002 to 2015
Description

By establishing the District, the Arizona State Legislature created an entity charged with keeping county residents safe from flood hazards and established an independent funding source for essential projects. The District is a municipal corporation and political subdivision of the State of Arizona. The Maricopa County Board of Supervisors doubles

By establishing the District, the Arizona State Legislature created an entity charged with keeping county residents safe from flood hazards and established an independent funding source for essential projects. The District is a municipal corporation and political subdivision of the State of Arizona. The Maricopa County Board of Supervisors doubles as the District's Board of Directors and receives counsel from the Flood Control Advisory Board comprised of county citizens.

ContributorsWitcher, James (Author) / The Pride Publishing Company (Client)
Created1994
Description

This summary report overviews a State of Arizona and U. S. Department of Energy funded drilling project to determine if near-term hot dry rock (HDR) geothermal potential exists in the eastern portion of the White Mountains region of Arizona. A 4,505 feet deep slim-hole exploratory well, Alpine1/Federal, was drilled within

This summary report overviews a State of Arizona and U. S. Department of Energy funded drilling project to determine if near-term hot dry rock (HDR) geothermal potential exists in the eastern portion of the White Mountains region of Arizona. A 4,505 feet deep slim-hole exploratory well, Alpine1/Federal, was drilled within the Apache-Sitgreaves National Forest at Alpine Divide near the Alpine Divide camp ground about 5 miles north of Alpine, Arizona in Apache County (Figure 1). A comprehensive technical report, in two parts, details the results of the project. Part 1, Alpine1/Federal, Drilling Report, discusses the drilling operations,
logging program, permitting and site selection for the hole. Part 2, Temperature Gradients, Geothermal Potential, and Geology, summarizes the temperature gradients, heat flow, geothermal potential, and subsurface geology.

42853-Thumbnail Image.png
Created2005-11-02
Description

A report shall be prepared at least every five years beginning in 1985 and shall indicate the past efforts of the district in eliminating or minimizing flood control problems and state the planned future work of the district to eliminate or minimize flood control problems.

42852-Thumbnail Image.png
Created2009
Description

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews

The 2009 Comprehensive Floodplain Management Plan and Program is intended to be used as a general guide for future decision-making in District activities. The Plan aims to present adequate background information to aid District staff in prioritizing areas for future studies and projects. The Plan identifies historic flooding events, reviews the District's efforts to solve flooding problems, and formulates five-year plans to reduce flooding through flood control project construction, floodplain identification, and planning programs throughout the county.

42040-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Publisher)
Created1996-12
Description

The Groundwater Cleanup Task Force has examined various aspects of Arizona's cleanup programs as well as similar programs in other states and on the federal level. Its members have debated these issues in detail, and present this report as a summary of the Task Force's work and recommendations.

41518-Thumbnail Image.png
ContributorsDarton, Nelson Horatio (Author) / Fred Harvey (Publisher)
Created1917
DescriptionBooklet describing a geological survey of the Grand Canyon. Four editions: 1917, 1929, 1936, 1950.
42859-Thumbnail Image.png
Created2010
Description

The District's Coordinated, Comprehensive, Collaborative Flood Hazard Mitigation Partnering (C3FHMP) effort addressed Strategic Initiative No.3 of the Flood Control District of Maricopa County 2009 Comprehensive Plan: Increase Collaboration and Partnerships. The District initiated the process to determine how the funding and resources of other entities could be best applied to

The District's Coordinated, Comprehensive, Collaborative Flood Hazard Mitigation Partnering (C3FHMP) effort addressed Strategic Initiative No.3 of the Flood Control District of Maricopa County 2009 Comprehensive Plan: Increase Collaboration and Partnerships. The District initiated the process to determine how the funding and resources of other entities could be best applied to mitigate flood hazards in Maricopa County, or where mutual benefits would be realized.

42362-Thumbnail Image.png
ContributorsNelson, James H. (Author) / Pearthree, Marie Slezak (Author of afterword, colophon, etc.) / The Pride Publishing Company (Contributor)
Created1983-08-15
Description

This plan has been prepared in recognition of area flooding problems induced by urbanization within this unusually flat portion of the Tucson basin.