Filtering by
- All Subjects: Flood control
- All Subjects: Parks
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Resource Type: Text
Arizona State Parks must prepare a Statewide Comprehensive Outdoor Recreation Plan every five years. This report is for 2003 through 2008. The primary purpose of this plan is to establish priorities for acquiring land and developing outdoor recreation facilities in Arizona.
This five-year update of Arizona’s Statewide Comprehensive Outdoor Recreation Plan (SCORP) is in accordance with the provisions of the Land and Water Conservation Fund Act, which was enacted in 1964 to encourage the provision of greater recreation opportunities for American citizens. Arizona receives annual congressional appropriations administered through the Arizona State Parks Board to fund state and local government sponsored outdoor recreation projects.
This update of Arizona’s Statewide Comprehensive Outdoor Recreation Plan is in accordance with the provisions of the Land and Water Conservation Fund Act, which was enacted in 1964 to encourage the provision of greater recreation opportunities for American citizens. Arizona receives annual congressional appropriations from LWCF, administered through the Arizona State Parks Board to fund state and local government sponsored outdoor recreation projects.
The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.
The Flecha Caida study area encompasses approximately eight square miles of the foothill region of the Santa Catalina Mountains. The three major washes studied include Finger Rock Wash, Valley View Wash, and Flecha Caida Wash. One tributary (Sky Club Wash) to the Valley View Wash and three tributaries to the Finger Rock Wash were also included in this study.
This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.
The purpose of this study is to develop a basin management plan for Highlands Wash and the two washes west of Highlands Wash.
The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of the existing hydrologic and basic hydraulic properties of the watershed.
This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.