Matching Items (19)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42217-Thumbnail Image.png
Created2002-10
Description

Arizona State Parks must prepare a Statewide Comprehensive Outdoor Recreation Plan every five years. This report is for 2003 through 2008. The primary purpose of this plan is to establish priorities for acquiring land and developing outdoor recreation facilities in Arizona.

Created1998 to 2003
Description

On March 2, 1999, the Board of Supervisors of Pima County, Arizona adopted the Sonoran Desert Conservation Plan. This Plan is the largest and most comprehensive regional multi-species conservation plan in the United States. These memorandums of understanding record the agreements made with cooperating agencies.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

Created2004 to 2013
Description

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in nonpoint source pollutant loadings and improvement in water quality resulting from program implementation.

42570-Thumbnail Image.png
Created2003-05
Description

One goal of the SDCP was to obtain a permit from the U.S. Fish and Wildlife Service under Section 10 of the Endangered Species Act to enable incidental take of species protected by the ESA in the course of development in Pima County. This report provides the county with the

One goal of the SDCP was to obtain a permit from the U.S. Fish and Wildlife Service under Section 10 of the Endangered Species Act to enable incidental take of species protected by the ESA in the course of development in Pima County. This report provides the county with the framework to go forward and further its analysis of the final funding costs for a Section 10 Permit.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.