Matching Items (427)
Filtering by

Clear all filters

41425-Thumbnail Image.jpg
ContributorsJackson, William H. (Author) / Atlantic and Pacific Railroad (Publisher) / W.H. Jackson and Co. (Photographer)
Description

Black and white stereograph card of a man sitting on an outcropping and overlooking the canyon. Circa 1879.

42555-Thumbnail Image.png
Created2008-09-04
Description

Conservation of the Tortolita Alluvial Fan landscape has been promoted by Pima County and Town of Marana over the past two decades. An interdepartmental team was formed to evaluate flood and debris flow hazards and the potential to create an expanded Tortolita Fan Preserve. This report provides an overview of

Conservation of the Tortolita Alluvial Fan landscape has been promoted by Pima County and Town of Marana over the past two decades. An interdepartmental team was formed to evaluate flood and debris flow hazards and the potential to create an expanded Tortolita Fan Preserve. This report provides an overview of the alluvial fan characteristics and evaluates information on the significance of the biological and cultural resources to determine of the area meets the criteria to create a federal preserve.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.

42362-Thumbnail Image.png
ContributorsNelson, James H. (Author) / Pearthree, Marie Slezak (Author of afterword, colophon, etc.) / The Pride Publishing Company (Contributor)
Created1983-08-15
Description

This plan has been prepared in recognition of area flooding problems induced by urbanization within this unusually flat portion of the Tucson basin.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.