Filtering by
- All Subjects: Proske, Hal
- All Subjects: Urban life
This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.
This addendum to the 2005 work plan identifies how additional assessment of groundwater features and contamination at Cave Creek Landfill will be conducted.
In August 2001, a resident of New River contacted the Arizona Department of Health Services, Office of Environmental Health to request information on the health risks of arsenic in drinking water. The resident collected two well water samples and submitted them to a private laboratory for arsenic analysis. The analyses detected arsenic at 560 and 600 μg/L. To confirm these very high arsenic results, ADHS staff sampled the well for arsenic and submitted the samples for analysis by the ADHS State Laboratory. Arsenic was detected at 340 μg/L. After that, a large number of people requested health advice on arsenic in their well water. This public health consultation primarily evaluates arsenic levels found in private wells and documents health advice provided to well owners. When other metals were found at levels of concern, health advice was provided to well owners regarding exposure to those metals too.
Black and white stereograph card of a man sitting on an outcropping and overlooking the canyon. Circa 1879.
Chiefly statistics from monitoring of wells in the areas adjacent to the Cave Creek Landfill.
This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.
This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.