Matching Items (3,387)
Filtering by

Clear all filters

41283-Thumbnail Image.png
ContributorsDawson, C. D. (Author)
Created1916-04-18
Description

Letter from C. D. Dawson to Carl Hayden urging him to consider the rights of miners and farmers when drawing up the boundaries for the proposed park.

41286-Thumbnail Image.png
ContributorsMyers, H. L. (Author)
Created1917-02-20
DescriptionReport to accompany S 8250. Calendar No.967; 64th Congress 2nd Session
41355-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1917-08-11
Description

Letter from Carl Hayden to W. W. Bass informing him that his contribution for maintaining the roads at the Grand Canyon has been reduced to $50 per year. Hayden also notes that no further action on national park status will be taken until December 1917 during the regular session of

Letter from Carl Hayden to W. W. Bass informing him that his contribution for maintaining the roads at the Grand Canyon has been reduced to $50 per year. Hayden also notes that no further action on national park status will be taken until December 1917 during the regular session of congress.

41376-Thumbnail Image.png
ContributorsCroaff, Thomas J. (Author)
Created1917-02-06
Description

Letter from attorney Thomas J. Croff to Carl Hayden informing him of the Atchison, Topeka, and Santa Fe railroad company's ownership of land inside the proposed national park boundaries.

41378-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1917-02-23
Description

Letter from Carl Hayden to C. T. Woolfolk thanking him for his support on the proposed bill. Hayden writes that the bill will not be introduced into the current session of Congress as any new legislation would be impossible to pass, but he is optimistic over the bill's future.

41873-Thumbnail Image.png
ContributorsTucson (Ariz.) (Author)
Created2009-01
Description

A plan to create a foundation upon which solar deployment in southern Arizona can be accelerated.

Created2009 to 2015
Description

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of advisory bodies appointed by the Pima County Board of Supervisors.

Created2011 to 2017
Description

Pima County Department of Environmental Quality monitors ambient (outdoor) air pollutants throughout eastern Pima County, including the Tucson metropolitan area and Green Valley. There are six principal pollutants, called “criteria” pollutants that are monitored in accordance with the National Ambient Air Quality Standards set by the Environmental Protection Agency to

Pima County Department of Environmental Quality monitors ambient (outdoor) air pollutants throughout eastern Pima County, including the Tucson metropolitan area and Green Valley. There are six principal pollutants, called “criteria” pollutants that are monitored in accordance with the National Ambient Air Quality Standards set by the Environmental Protection Agency to comply with the Federal Clean Air Act. These standards were established to protect public health and the environment from harmful levels of air pollution.

Created2010 to 2016
Description

The Pima County Department of Environmental Quality has prepared this document to be submitted to the U.S. Environmental Protection Agency, Region IX. The purpose of the Ambient Air Monitoring Network Plan is to determine if the network is achieving the air monitoring objectives specified in 40 CFR Part 58 Appendix

The Pima County Department of Environmental Quality has prepared this document to be submitted to the U.S. Environmental Protection Agency, Region IX. The purpose of the Ambient Air Monitoring Network Plan is to determine if the network is achieving the air monitoring objectives specified in 40 CFR Part 58 Appendix D, which mandate adherence to certain number, type and location requirements of monitoring sites and specific site criteria such as monitoring inlet height. The review should also determine if modifications should be made to the network (e.g. through the termination or relocation of unnecessary stations or addition of new stations). In addition, the review is necessary in order to ensure that the residents of Pima County are provided adequate, representative and useful air quality data, and to provide adequate protection to public health.

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.