Matching Items (359)
Filtering by

Clear all filters

42321-Thumbnail Image.png
Created2000-10-06
Description

The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42323-Thumbnail Image.png
Created1999-01
Description

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42329-Thumbnail Image.png
Created1994-07-01
Description

This report was prepared to document surface water hydrology and floodplain conditions in accordance with current standards of practice. This information is intended to support issuance of building permits, re-approval of construction drawings to current standards, and issuance of floodplain use permits, if needed.

42545-Thumbnail Image.png
Created2012-11
Description

Pima County is now finalizing the long-awaited Multi-species Conservation Plan, which, if approved by the U.S. Fish and Wildlife Service, will streamline public-sector and private-sector development compliance with the Endangered Species Act while protecting endangered species and their habitats. In the coming months, the public will have a chance to

Pima County is now finalizing the long-awaited Multi-species Conservation Plan, which, if approved by the U.S. Fish and Wildlife Service, will streamline public-sector and private-sector development compliance with the Endangered Species Act while protecting endangered species and their habitats. In the coming months, the public will have a chance to comment on the MSCP through the U.S. Fish and Wildlife Service’s formal public comment process before it goes to the County Board of Supervisors for final adoption.This report reviews the history of the MSCP, its relationship with the award-winning Sonoran Desert Conservation Plan, what benefits the MSCP will bring to the community, and what obligations the County, developers, and the taxpayers will have over time. The report also highlights other benefits of conservation actions undertaken by Pima County, including economic, recreation, and health benefits.

42546-Thumbnail Image.png
Created2011-02
Description

The purpose of this report is to highlight lands acquired with 1997 and 2004 voter-approved bond funds, provide a historical record of Pima County’s land conservation efforts and consider how these properties contribute to Pima County’s long-term vision – the Sonoran Desert Conservation Plan. The report also provides a special

The purpose of this report is to highlight lands acquired with 1997 and 2004 voter-approved bond funds, provide a historical record of Pima County’s land conservation efforts and consider how these properties contribute to Pima County’s long-term vision – the Sonoran Desert Conservation Plan. The report also provides a special feature on the evolution of conservation and land use planning in Pima County.