Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Canton
- All Subjects: Landscapes
- Status: Published
Plan of Babel Canyon Arcology city structure design by Paolo Soleri, from 1970 exhibit at Corcoran Gallery of Art, Washington, DC
The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while steering community development and project funding. The study findings will also be incorporated into the Town's Capital Improvement Planning process for the next 5-, 10-, and 20-year time frames.
The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan for 44 species that may be impacted as a result of the otherwise lawful activities of Pima County and its development community. The Incidental Take Permit, also called a Section 10 permit, will be for 30 years. This MSCP is part of the required documentation needed to receive an Incidental Take Permit under Section 10(a)(1)(B) of the ESA.
The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community and committee members. A public process will be conducted so that during 200t the document can be finalized and submitted to the U.S. Fish and Wildlife Service as part of the application for a federal endangered species permit.
Newsletter with information you should know about the Sonoran Desert Conservation Plan and Comprehensive Land Use Plan.
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
The purpose of this study is to provide flood and erosion hazard information for Soldier Canyon Wash for use by the District in floodplain use permitting and and floodplain management.