Matching Items (276)
Filtering by

Clear all filters

118717-Thumbnail Image.png
Created1992-02
Description

This research study of pavement smoothness measurement was conducted in order to develop and implement an improved highway smoothness construction specification on asphalt concrete pavements. Achieving a higher level of smoothness on highways during construction results in savings to the taxpayer due to reduced wear and tear on vehicles, and

This research study of pavement smoothness measurement was conducted in order to develop and implement an improved highway smoothness construction specification on asphalt concrete pavements. Achieving a higher level of smoothness on highways during construction results in savings to the taxpayer due to reduced wear and tear on vehicles, and longer highway life. Although the current ADOT specification used for highway smoothness addresses localized smoothness problems, it is difficult to administer due to the measurement system used, and provides little impetus to the contractor to improve his quality of work with respect to overall highway smoothness. This study provided data to assist ADOT in developing a new smoothness specification that would provide incentive to contractors to construct smoother pavements and which is easier for ADOT to administer. In order to provide incentive to contractors, a pavement smoothness construction quality control draft specification and associated measurement procedure was produced.

41354-Thumbnail Image.png
ContributorsBass, W. W. (Author)
Created1918-09-22
Description

Letter from W. W. Bass to Carl Hayden requesting the boundaries of the park be reconsidered as a large portion of the land is suitable for mining and farming.

41358-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1917-06-28
Description

Letter from Carl Hayden to W. W. Bass concerning the passing of the national park bill. Hayden states that he will try to make the bill as advantageous to Arizona miners and farmers as possible, but the land will either remain as a national monument or become a national park.

Letter from Carl Hayden to W. W. Bass concerning the passing of the national park bill. Hayden states that he will try to make the bill as advantageous to Arizona miners and farmers as possible, but the land will either remain as a national monument or become a national park. A postscript is added concerning the land allocated for the Havasupai Tribe.

Created2002 to 2017
Description

Mission: To regulate and support Arizona Agriculture in a manner that encourages farming, ranching and agribusiness, while protecting consumers and natural resources.

41236-Thumbnail Image.png
Description

Amendments to the bill establishing the Grand Canyon a National Monument. Circa 1908.

42837-Thumbnail Image.png
ContributorsSeeds, Stephen B. (Author) / Peshkin, David G. (Author) / RTI International (Contributor)
Created2013-11
Description

In the mid‐1990s, the Arizona Department of Transportation initiated the Maintenance Cost Effectiveness study (SPR 371) with the development of plans and an experiment design to evaluate the effectiveness of a variety of asphalt pavement maintenance treatments. During 1999 and 2001, ADOT oversaw the construction of hundreds of experimental sections

In the mid‐1990s, the Arizona Department of Transportation initiated the Maintenance Cost Effectiveness study (SPR 371) with the development of plans and an experiment design to evaluate the effectiveness of a variety of asphalt pavement maintenance treatments. During 1999 and 2001, ADOT oversaw the construction of hundreds of experimental sections throughout the state under the Phase I, Wearing Course Experiment (nine treatments and 82 sections at three sites), and the Phase II, Preventive Maintenance Experiment (24 treatments and 137 sections at four sites). Work continued in 2006 and 2007 under the Evaluation of Maintenance Strategies study (SPR 628) for ADOT with a yearlong program of pavement performance monitoring involving manual pavement distress surveys and automated skid, friction, and surface texture measurements at all the experimental sites. The project culminated with a detailed analysis of key pavement performance data to compare the performance of the individual treatments and determine their overall effectiveness. This report documents the independent findings of both the Phase I and II experiments.