Matching Items (793)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2010-06-10
Description

The purpose of this study is to provide flood and erosion hazard information for Soldier Canyon Wash for use by the District in floodplain use permitting and and floodplain management.

Created2012 to 2013
Description

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed

The Drug Treatment Alternative to Prison (DTAP) Program enables drug addicted criminal defendants to plead guilty to an offense and then enter a residential, therapeutic community treatment system for three years as an alternative to a prison sentence. The Program begins with three months of in-patient, residential drug treatment followed by wraparound recovery support services managed by a resources specialist, including transitional housing, literacy services, higher education, job training and placement services, and counseling, accompanied by drug testing, probation monitoring, and regular court hearings.

Created2010 to 2013
Description

The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.
ContributorsShand, Robert L. (Author) / U.S. Fish and Wildlife Service (Publisher)
Created1992-07-24
Description

This report presents the results of both a qualitative and quantitative analysis of the drainage problems associated with the South Branch, Upper Carmack watershed. Also included is an economic assessment of the damage potential associated with three distinct storm events.

Created2005 to 2008
Description

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.

Created2007 to 2017
Description

The 20-year transportation plan includes roadway, transit, safety, and environmental and economic vitality elements to help meet the region's transportation goals of improving our safety and cross-town mobility, while reducing traffic congestion.

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.